Functional Expertise

  • Project / Program Management
  • Product Management
  • Operations & Supply Chain

Education

Maulana Azad National Institute of Technology, Bhopal
B.Tech


Certifications

• Google Data Analytics
• Project Management Basics


Professional Recognitions

• Awarded employee of the year for consecutive 2yrs in 2020-21 & 2021-22.
• Awarded with the INOVE YOU award for the best innovation idea implementation in 2020-21.


Extra-Curricular Activities

• Member of Student Placement Committee for IPMX2023-24 batch.
• Led a reading club and organized regular meets for book discussions and book challenges.

Anuj Kaushal

"Spearheaded projects throughout the lifecycle as a Program manager worth 500cr to provide competitive advantage to the firm. Provided insights through financial analysis as a member of core startegy group for the vendor development of rolling stock projects. Led a team of 10 for implementing the Digital transformation project worth 150cr.

  • Rolling Stock
  • Oil and Gas/Energy

Work Exp | 8 years

Process and Design Lead
Alstom Transport India Ltd
Bangalore

• Spearheaded the team of 10members for the execution of two metro projects in the record time of 14months.
• Pioneered the successful establishment of a new vendor network, building strategic partnerships from inception to drive cost savings, ensure quality standards, and enhance supply chain efficiency.
• Attained cost avoidance of around Rs 3cr through make and buy decisions for selection of parts and products and achieved 15% method time reduction and saving of ~INR 1cr by implementing DELMIA tool in coordination CoE in industrial


Product Lead
Prayogik Technologies
Ahmedabad

• Guided the team of five for the entire product lifecycle from design to product delivery for the company’s flagship product.
• Assessed the way to reduce the product development cost saving Rs 5lakh on prototype built through localization of parts.
• Led a team for the testing of the TMSG product at Indian Army Siachen Base Camp at -40deg C temperature.


Process Engineer
AlstomTransport
Bangalore

• Deployed NEO tool for reducing the method time by 25% for industrialization efforts across Alstom sites while stationed at Paris for 4months and achieved cost saving of ~INR 3.8mn.
• Saved around INR 7.5mn across 3 projects with the creation of Universal Test Jig for optimizing harness testing.
• Industrialized harness manufacturing and integration of Sydney Metro and Kochi Metro projects.